Bayan Khundii Gold, Mongolia,
Erdene, Canada
Study, Detail Design, Construction Engineering Support
Bayan Khundii Gold Was Commissioned in September 2025. Due to the climate conditions ranging from below zero to very high temperatures in the summer season. the Process Plant is contained in a heavily insulated factory type building, with a working area temperature of 18 degrees.
The climate conditions also required strict construction management to schedule each of the construction phases.